Summary
Overview
Work History
Education
Skills
Timeline
Generic

Joe Ashworth

McKee

Summary

Accomplished Electrical Quality Control Technician specializing in voltage verification and regulatory compliance at Merit Electrical. Demonstrated expertise in optimizing quality assurance processes and effectively training teams. Acknowledged for outstanding problem-solving abilities and precise record-keeping, fostering project success and ensuring compliance with industry standards.

Overview

32
32
years of professional experience

Work History

Quality Control Inspector

Merit Electrical
Holly Springs
09.2024 - Current
  • As a quality control inspector at the Fuji Films facility, I witnessed voltage verifications, continuity checks, and ensured torque values were correct and per code.
  • I recorded the needed data on forms and then uploaded them into the database by test package.
  • Working alongside the client to sell the systems and provide the needed documentation for their records.
  • I was introduced to the Procore format, which I found extremely useful, advantageous, and convenient.
  • The traceability and management of records digitally has become extremely important and useful in our trade.
  • Continuing my education and keeping NECA codes fresh in mind has helped me stand out in my discipline.
  • Communicated effectively with management regarding progress toward meeting quality objectives.
  • Recommended improvement measures to production process to meet quality control standards.
  • Produced official reports of findings to meet regulatory standards and assist senior leadership with improving operations.
  • Consulted with engineers to resolve quality, production, and efficiency problems.
  • Evaluated suppliers' performance against established criteria for quality assurance purposes.
  • Noted changes during testing in project documentation.
  • Administered competency tests to determine engineers or operators are qualified to use equipment.
  • Trained newly hired employees by explaining company procedures, job duties and performance expectations.

Electrical QC

CTCIA
Bakersfield
11.2022 - 08.2024
  • Electrical QC at the Bakersfield Refinery (BKRF) in California, my duties included the traceability of records of quality construction and commissioning.
  • I recorded photos and linked them with electronic documents using a local database.
  • We used SharePoint, Adept, and WinPCS for the capture of all the documents for future review.
  • I oversaw the calibration of the instrumentation and valves on all the new construction on site.
  • I have a broad knowledge of the inner workings of both the refinery facilities and pipeline worlds.
  • Pen to paper, or electronic recording, is not an issue.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.
  • Maintained updated knowledge through continuing education and advanced training.
  • Recognized by management for providing exceptional customer service.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.
  • Updated and maintained databases with current information.
  • Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
  • Approached customers and engaged in conversation through use of effective interpersonal and people skills.
  • Promoted high customer satisfaction by resolving problems with knowledgeable and friendly service.

Electrical Quality Control Technician

Project Consulting Services
Houston
03.2013 - 11.2022
  • Electrical Quality Control Technician, that ensured all data was captured and recorded for turn-over books.
  • Ensured support for the testing, support and start-up of remote pump stations and crude oil facilities.
  • Tracked cost and site hours and stayed below budget.
  • Ensured all testing was performed within the client's standards and regulations.
  • Managed site scheduling for vendors needed for specialty work.
  • Gathered and transferred all as-builts and redlines and passed them to the engineering dept. with unmistakable clarity.
  • Managed multiple crews of different tasks simultaneously.
  • Collaborated with multiple project managers to make sure all obligations were met.
  • I was also involved in the CATS material traceability, as well.
  • Maintained accurate records on product inspection results and reported findings to management team.
  • Completed data capture forms, equipment logbooks or inventory forms to support testing procedures.
  • Resolved customer complaints regarding product quality in a timely manner.
  • Completed routine inspections of components and products to fulfill quality assurance requirements.
  • Verified conformance of parts using statistical sampling techniques such as ANSI and ASQ Z1.4.
  • Conducted frequent quality and compliance reviews of production work.
  • Reviewed engineering drawings and technical documents for accuracy and completeness prior to release for manufacturing use.
  • Trained employees in proper equipment use and product testing procedures.
  • Monitored daily performance of production team to identify and address issues affecting quality product output.

E&I General Foreman

Overland Construction Inc.
Overland
07.2012 - 03.2013
  • E&I General Foreman at a project in Hackberry, LA, at the CLNG, installing a couple of 5 kV compressors.
  • My job duties included the job planning and procurement of materials needed for the project, while directing the supervisors and their crews in a safe and productive manner.
  • The project taught me the importance of duty delegation and record keeping.
  • Followed rules and regulations to keep job sites safe for workers, contractors and visitors.
  • Monitored project progress to ensure efficient use of resources and timely completion of tasks.
  • Developed and implemented job plans for construction projects.
  • Viewed and checked job equipment to determine maintenance requirements.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.
  • Reviewed estimates for labor costs, material costs, equipment costs.

Electrical General Foreman

Integrated Electrical Services
Pt. Arthur
05.2011 - 06.2012
  • Supervised a group of employees.
  • Installed cable tray, conduit, MCCs, instruments, and ground grid.
  • Terminated all pumps, control stations, and instruments in the field and at the PLC at Motiva in Pt. Arthur, TX.
  • Monitored equipment operation during extraction process to detect problems.
  • Provided technical assistance for difficult electrical and maintenance problems.
  • Scheduled materials, tools, equipment, inspections, and personnel required for completion of each task or project.
  • Kept production team moving forward for progress in daily site operations.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Enforced safety regulations and penalized workers for not following work safety agreements.

Foreman

Triad Electronics & Controls
10.2006 - 05.2011
  • Worked on several turnarounds and completed new installations of gas monitoring systems.
  • Supervised a crew of 12 electricians for the duration of the installation of a security system for CLNG in Hackberry, LA.
  • Monitored the cut-over of the entire system at the Navajo Refinery in Artesia, NM, which included bringing in and setting up the new RIE building, ordering, pulling, and terminating cables in field J-boxes, and out to the instruments. Then, I led the crew in the cut-over of all instruments plant-wide without a single mishap.
  • Organized meetings with clients to discuss project specifications.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Monitored equipment operation during extraction process to detect problems.
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Prepared budgets for projects based on labor costs, materials needed.

Electrician

The Shaw Group
05.2004 - 09.2006
  • Worked on high voltage switchgear projects involving transformer hookups and terminations up to 15kv level.
  • Troubleshot EMCS and variable frequency drive systems to correct and rectify issues.
  • Oversaw project details and adhered to diagnosis, wiring and OSHA regulations.
  • Constructed control panels from blueprints or schematic drawings.
  • Interpreted blueprints and technical drawings to correctly assemble panels and control boxes.
  • Inspected electrical equipment and systems to identify hazards, defects and the need for adjustment or repair.

Electrician

United Technical Services
Lake Charles
10.1997 - 05.2004
  • Worked on high voltage switchgear projects involving transformer hookups and terminations up to 15kv level.
  • Oversaw project details and adhered to diagnosis, wiring and OSHA regulations.
  • Constructed control panels from blueprints or schematic drawings.
  • Fabricated parts according to specifications using hand and power tools.
  • Connected wires to circuit breakers and transformers.
  • Inspected electrical equipment and systems to identify hazards, defects and the need for adjustment or repair.

Electrician

Chicago Bridges & Iron
Lake Charles
02.1995 - 09.1997
  • Diagnosed malfunctioning wiring using test equipment to locate faults.
  • Identified problems with electrical systems by observing operation, listening for problems and using test equipment such as multi-meters.
  • Dismantled electrical components using hand tools to disconnect and restore wiring connections.
  • Used power construction equipment, measuring devices and testing equipment to complete electrical installations.
  • Connected wires to circuit breakers, junction boxes and components in residential and commercial properties.
  • Worked extensively on three-phase, 277/480 volt power distribution systems.
  • Installed conduits or pipes inside partitions, walls or other designated, concealed areas.

Electrical Apprentice

Triad Electronics & Controls
Lake Charles
10.1993 - 02.1995
  • Installed ground fault circuit interrupter outlets per code requirements.
  • Read and interpreted blueprints, schematics, diagrams, and technical documents for installation of new systems.
  • Built controllers and panels to complete system installations.
  • Reviewed blueprints to determine electrical component and wiring locations.
  • Identified problems with circuits or equipment using testing devices such as multimeters or oscilloscopes.
  • Demonstrated strong foundation of safety knowledge and implemented industry best practices.
  • Installed leads and connected cables to motors, apparatus and equipment.

Education

General Apprenticeship - Electrical Construction

SOWELA Technical Community College
Lake Charles, LA
01.1995

Skills

  • Microsoft Office Suite
  • Voltage verification
  • Continuity testing
  • Apple software proficiency
  • Adobe Creative Suite
  • Bluebeam expertise
  • Torque measurement
  • Data management
  • Regulatory compliance
  • Calibration oversight
  • Employee training
  • Team collaboration
  • OSHA compliance
  • Quality assurance
  • Record keeping
  • Forms management
  • Teamwork
  • Problem-solving abilities
  • Software applications

Timeline

Quality Control Inspector

Merit Electrical
09.2024 - Current

Electrical QC

CTCIA
11.2022 - 08.2024

Electrical Quality Control Technician

Project Consulting Services
03.2013 - 11.2022

E&I General Foreman

Overland Construction Inc.
07.2012 - 03.2013

Electrical General Foreman

Integrated Electrical Services
05.2011 - 06.2012

Foreman

Triad Electronics & Controls
10.2006 - 05.2011

Electrician

The Shaw Group
05.2004 - 09.2006

Electrician

United Technical Services
10.1997 - 05.2004

Electrician

Chicago Bridges & Iron
02.1995 - 09.1997

Electrical Apprentice

Triad Electronics & Controls
10.1993 - 02.1995

General Apprenticeship - Electrical Construction

SOWELA Technical Community College
Joe Ashworth