Engineering Co-op
East Kentucky Power Cooperative
Maysville
01.2023 - 08.2024
- Executed environmental/process engineering tasks at Spurlock Station, contributing to project goals during summer 2024.
- Used PI/Historian Data to make calculated changes to the PLC logic for LMS 100 Super Core Turbine
- Led team of 3 co-op students in Unit 3 repairs, enhancing collaborative problem-solving and technical skills.
- Used AutoCAD to Design the sheet repair for the Baghouse
- Developed and proved new design for the ash mixers nozzles using engineering analysis.
- Created reports on limestone efficiency using on-site data from PI Vision, informing operational improvements.
- Worked with suppliers to optimize the product to design necessities
- 2nd Term: Field Service Experience – Spurlock Station Unit 2/3, Fall 2024
- Performed Lab testing on the Gypsum in wastewater treatment
- Stayed with Operators to understand field practices for plant maintenance
- Improved management coordination with contractors on widespread projects