
Dynamic electrician with extensive experience at Tradesmen International, specializing in wiring installation and electrical troubleshooting. Proven ability to collaborate effectively in team environments while executing complex projects, including the installation of car chargers and lighting systems. Committed to delivering high-quality electrical solutions in new construction and renovation settings.
I worked in a Amazon parking lot where I installed 2” pvc pipe and panels for the chargers and also transformers and terminate them, and installed car chargers and terminate them, then worked in elizabethtown where I did demolition of 3/4” pipe, troff, lights and disconnects, and also installed basket trays and panels for the new area.
I worked in a commercial building where I installed basket trays, 3/4”, 1”, 2” and 3” emt conduit, pulled wire for the lights, disconnects, and fire alarm. Then worked in Alabama at a JM smuckers building where I installed 3/4” aluminum pipe and 3/4” stainless steel pipe, I ran a little of cable tray, and pulled wire for the lights, installed a few panels with aluminum pipes, drill holes through dry wall, and concrete walls, used scissor lifts, boom lifts and one man lift to complete the tasks, installed temporary lights, stud welding for support of the pipes onto beams, grinding beams for grounding, installed 3” pipes, run pipe to the ceiling for the ac units, and terminate them. Went to South Carolina at a BMW job site and did a lot of installing panels for lights and receptacles, and installed white poles for receptacles, and installed 3/4” pipe and 4” rigid
I first worked with pvc under ground pipe for an Amazon parking lot in Lexington for a few weeks. Then went to Georgia and worked at a SK battery plant and installed only 3/4” EMT conduit, and also pulled wire for fire alarm and installed the fire alarm devices. Then went back to Kentucky and worked in a greenhouse where I installed some basket trays, installed pvc, and ran a lot of mc cable.